7.1. Opportunities for Scaling Up Wind Power in the Philippines by F. Sibayan

10 pages
232 views

Please download to get full document.

View again

of 10
All materials on our website are shared by users. If you have any questions about copyright issues, please report us to resolve them. We are always happy to assist you.
Share
Description
Presentation in ADB Quantum Leap in Wind Workshop, 21 June 2010
Tags
Transcript
  Opportunities of Power in the DEPARTMENT OF ENERGYDEPARTMENT OF ENERGY Fortunato Officer-iSolar & Wind Energy Quantum Leap in Wind Power i21 Jun The views expressed in this presentation are those of the present Scaling-up Wind Philippines 1 S. Sibayan -Chargeanagement Division Asia –Structured Consultation2010 r and do not necessarily represent those of the Asian Development Bank.  Power Sect ã Population 83 million; 82% conn ã Energy Mix  – at 57% fossil fuel-boil), 43% Renewable Energy ã Power Generation: RE Accounts3,478 MW, Geothermal  – 1,972 MSolar  – 6.7 MW)  DEPARTMENT OF ENERGYDEPARTMENT OF ENERGY ã ecrcy ar  – cens ã Generation rate  – US cents 0.06 ã Required new capacity (2009-20Visayas –2,150 MW & Mindanao –  Committed capacity  – 1,354 MW  Grid interconnection  – Luzon & r Overview ected to the gridsed (33% imported fuel  – coal and35% of the generation mix (Hydro  – W, Biomass  – 75.5 MW, Wind  – 33 MW,    – among wors geso 0.10/kWh (PhP 2.96 to 4.39/kWh)30) is 16,550 MW (Luzon -11,900 MW,2,500 MW)while indicative capacity  – 4,211 MWisayas grids are interconnected  RE PLAN (2RE PLAN (2 RE Law,RE Law, Small capacity RESmall capacity RE 2010201020082008 ENSURING STABLE AND Q ENSURING STABLE AND Q  Intensify RE DevelopIntensify RE Develop ã Energy security and energy indepesufficiency by 2010 and 90% house RE Subsidiary,RE Subsidiary,TechnologyTechnologyRoadmap &Roadmap &OneOne--stop shopstop shop 2  projects areprojects areadded to the grid;added to the grid;big RE projectsbig RE projectsare in the pipelinare in the pipelin 1 DOUBLEDOUBLE(5,(5, IMPROVE RE POLICIESIMPROVE RE POLICIESAND PROGRAMSAND PROGRAMS STRAT 0   808 ––2030)2030) 0150152020202020302030 Emergence of Emergence of -- ALITY SUPPLY OF ENERGYALITY SUPPLY OF ENERGY ment and Utilizationment and Utilization dence targets: 60% energy self old level electrification rate by 2017 534  projects, e.g.projects, e.g.OTEC, wave,OTEC, wave,marine currentmarine currentand tidaland tidalzation of oceanzation of oceanenergyenergytechnologiestechnologies OPTIMIZATIONOPTIMIZATIONOF REOF RERESOURCESRESOURCES RE CAPACITYRE CAPACITY00 MW)00 MW) EGIES  Wind R  ã Limited indigenous fossil fuel resources but siresources WIND ATLAS DEPARTMENT OF ENERGYDEPARTMENT OF ENERGY sources Identified potential sites withpower density of at least 500W/m 2 and transmission line over25% of levelized cost of combinedgeneration and transmissioncosts.nificant solar, geothermal, hydro and windPhilippine total potential is about7,400 MW covering 1,038 windsites:Luzon: 686 sites; 4,900 MWVisayas: 305 sites; 2,168 MWMindanao: 47 sites; 336 MW
Related Search
We Need Your Support
Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

Thanks to everyone for your continued support.

No, Thanks